Skip to content

Prepare for 2.6.2 #1533

Prepare for 2.6.2

Prepare for 2.6.2 #1533

Triggered via push September 2, 2025 16:07
Status Failure
Total duration 22s
Artifacts

test.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

21 errors
test (2.1)
Process completed with exit code 1.
test (2.2)
The operation was canceled.
test (2.2)
The strategy configuration was canceled because "test._2_1" failed
test (2.3)
The operation was canceled.
test (2.3)
The strategy configuration was canceled because "test._2_1" failed
test (3.0)
The operation was canceled.
test (3.0)
The strategy configuration was canceled because "test._2_1" failed
test (2.7)
The operation was canceled.
test (2.7)
The strategy configuration was canceled because "test._2_1" failed
test (2.5)
The operation was canceled.
test (2.5)
The strategy configuration was canceled because "test._2_1" failed
test (2.6)
The operation was canceled.
test (2.6)
The strategy configuration was canceled because "test._2_1" failed
test (ruby-head)
The operation was canceled.
test (ruby-head)
The strategy configuration was canceled because "test._2_1" failed
test (2.4)
The operation was canceled.
test (2.4)
The strategy configuration was canceled because "test._2_1" failed
test (truffleruby-head)
The operation was canceled.
test (truffleruby-head)
The strategy configuration was canceled because "test._2_1" failed
test (jruby-head)
The operation was canceled.
test (jruby-head)
The strategy configuration was canceled because "test._2_1" failed